Past Projects
The Belvedere
Westchester, NY
Sunny Brook Field Senior Housing
Ludlow, MA
Whalers
Cove, New Bedford, MA
OceanView,
Beverly, MA
Massport
Parking, Chelsea, MA
Sedge
Meadows, Wayland, MA
260
Park Ave. South,
New York, NY
Carding
Mill, Sudbury, MA
Haskell
House, Boston, MA
Landmark
at West Springfield, MA
Landmark
at Fall River, MA
The
Birches at Weston, MA
Franklin
Pierce Law Center, Concord, NH
BJ's
Wholesale Club,
Portsmouth, NH
RECOLL
Management, Boston, MA
Lakeside
at Winnipesauke,
Alton, NH
Beverly
Rocks, Beverly Farms, MA
Porter
Exchange Mall,
Cambridge, MA
Powderhouse
Square Condominiums, Medford, Ma
The
Regency Building,
Worcester, MA
Back
Bay & South End Historic Conversions,
Boston and Chelsea, MA
Cape Rosier, Ellsworth, ME
Landmark
at Danvers, Danvers, MA |
|
Eastern Avenue Parking Facility
Chelsea, Massachusetts
| The
Eastern Avenue Parking Facility is a 1550 car parking facility under long term
lease to MassPort providing short and long term parking for Logan Airport Airline
and MassPort Employees. This facility is a five story, post tensioned, re-enforced
concrete structure containing 14,000 yards custom designed concrete placed during
the winter months. This facility was developed during the time when The City of
Chelsea was in receivership. The project assisted Chelsea in stimulating its local
economy through economic development of underutilized and environmentally contaminated
sites. The project team included Turner Construction, Add Inc., Walker Parking
Consultants and McNamara Salvia.
|
 |
| Construction commences on a 1550 car parking
facility for Massport in Chelsea during its resurgence from receivership. |
 |
 |
Over four hundred piles are driven 100 feet
into the earth. The structure is designed as post tensioned, reinforced concrete. |
| The 5 story structure begins to rise. The custom
form systems allow for the project team to save two months on the schedule. |
 |
 |
The post tensioned, reinforced concrete employed
over 250 union workers, carpenters, laborers and masons during the construction. |
| The concrete placements were composed of building
fifths. The winter conditions required encapsulation for curing strength. |
 |
 |
More than 14,000 cubic yards of concrete were
placed during the winter. The form systems are specially designed to allow for
multiple concrete scheduling. |
| The exterior design evolved with public input
for reducing the massing and scale. The pre-cast panels varied to address the
residential neighborhood. |
 |
| |
|
| Project Summary: |
1550 Car Parking Facility for long
term lease by MassPort |
| Total Project
Cost: |
$38,000,000 |
| Financing: |
Northwestern Mutual, Private Equity |
| Primary Services: |
Project Manager for Northland Investment
Corporation and Transdel Corporation including financing, design, approvals and
construction oversight. |
|
|